Back To Top

What Is A Build Over Agreement

What Is A Build Over Agreement

What is a construction agreement? A construction building is a water agency quality label for the work you want to do above or near a public channel that belongs to them. There is the certainty that you have given the sewers the proper clearance of your new foundations. It also ensures sufficient access to the channel so they can clean or repair it if necessary. There is also the security of these facts for anyone who wants to buy your property, you should come to sell. For more information on construction agreements, see Thames Water`s responses: The first point is that a construction agreement only applies to sewers and public sewers. For all excavation work within 3 metres of a public sewer or sewer, a Thames Water Build over Agreement is required. Given the density of construction in London and other cities, this probably means that all the work you intend to do for your domain, including excavations, will likely require the verification and approval of Thames Water. Third, the risk of damage to the building due to the sewer failure is not excessive with respect to: what does the construction cover on an agreeable basis? For small sewers (160mm and up) The levy covers: – Processing your application – Technical checks of your plans – Discussion and agreement of design changes – Cooperation with your local authority under the building rules – Granting your agreement – Registration of the agreement on or near public sewers on our statements for medium sewers (160 – 375mm) and commercial real estate. As above, but with 2 ccTV investigations on the length of the sewers concerned. One before and one after your construction. For large sewers (375mm and up) As above, but with much more time needed by our engineers and 2 measurements. This investigation may be by entering CCTV or man who will be with significant additional costs. We won`t know what`s needed before you apply and we`ve seen your plans and sewers involved You`ll also let us know if you find that the affected sewers/sewers are in poor condition or the soil conditions are unsatisfactory.

In this case, we will visit one of our own inspectors on the site to see what needs to happen next. With regard to taking into account the impact of the new foundations and the current requirements of the construction law, which stipulates that the new foundations must have a depth of at least one metre. The depth of these foundations and the extra weight of the new structure can lead to broken leaks or pipes, which can lead to flooding. We saw a case where the owner assumed that the contractor had handled the Thames Water Build over Agreement, while the contractor assumed it was the owner. This confusion resulted in a four-week delay in the work, while location studies were conducted, plans were drawn up and Thames Water Engineer visited the website. Any inspector who has inspected a site on our behalf (either by a local authority or by an independent company) will inform us of developments that do not exceed the permitted permitting limits, i.e. that construction/extension is a specified length or when the sewers/sewers are particularly large or deep. The control of the buildings will therefore require both details of the proposal and a copy of the construction contract submitted by the sanitation authority. For more information about construction via a public channel, contact us at wastewaterdeveloperservices@uuplc.co.uk. The application for a construction agreement is defined in the building regulations, Part H4.